Building Regulations Part L 2025 requires U-value ≤0.16 W/m²K (300mm mineral wool). Updated standards for new builds, extensions, and renovations.

By BookMyRoofer Team • 10 February 2026

UK’s Building Regulations Part L (Conservation of Fuel & Energy) sets minimum insulation standards for roofs. The 2025 requirements are among the strictest in Europe.

Part L 2025: Roof Insulation U-Value Requirements

U-Value Definition

U-value = rate of heat transfer through a building element (W/m²K)

Lower U-value = better insulation = less heat loss

Current Standards (2025)

Building TypeRoof ElementMaximum U-ValueMinimum Insulation Depth
New DwellingsPitched roof (attic)0.16 W/m²K300mm mineral wool
New DwellingsFlat roof0.16 W/m²K150mm PIR insulation
New DwellingsRafter insulation0.16 W/m²K200mm PIR + 50mm internal
ExtensionsAll roof types0.16 W/m²KSame as new builds
Renovations (>25%)All roof types0.16 W/m²KUpgrade required
Existing (voluntary)Attic0.16 W/m²KEnergy Saving Trust grant standard

Source: gov.uk Technical Guidance Document Part L 2025

Historical Comparison

EraStandardTypical DepthU-Value
Pre-1970sNone0mm2.3 W/m²K
1980s50mm50mm mineral wool0.6 W/m²K
2000s100mm100mm mineral wool0.35 W/m²K
2011200mm200mm mineral wool0.20 W/m²K
2019250mm250mm mineral wool0.18 W/m²K
2025300mm300mm mineral wool0.16 W/m²K

Trend: Standards tightening 30% every 10 years.

How to Achieve 0.16 W/m²K

Method 1: Attic/Loft Insulation (Pitched Roof)

Installation layers:

  1. Between joists: 100mm mineral wool (first layer)
  2. Cross-layer: 200mm mineral wool (perpendicular to joists)
  3. Air gap: 50mm above insulation (ventilation)

Total depth: 300mm

Materials:

  • Mineral wool (Rockwool/Knauf): £8–£12/m², R-value 0.037 W/mK
  • Glass wool (Isover): £6–£10/m², R-value 0.035 W/mK
  • PIR boards (rigid): £25–£35/m², R-value 0.022 W/mK (thinner option)

U-value calculation:

  • 300mm mineral wool: R-value = 0.3m ÷ 0.037 = 8.1 m²K/W
  • U-value = 1 ÷ (8.1 + 0.17*) = 0.13 W/m²K ✅ (exceeds 0.16 requirement)

*0.17 = surface resistance + air gap + deck

Method 2: Flat Roof Insulation

Warm deck system (most common):

  1. Structural deck (concrete/timber)
  2. Vapor control layer
  3. 150mm PIR insulation boards (Kingspan/Xtratherm)
  4. Waterproof membrane (EPDM/GRP)

U-value calculation:

  • 150mm PIR: R-value = 0.15m ÷ 0.022 = 6.8 m²K/W
  • U-value = 1 ÷ (6.8 + 0.14*) = 0.14 W/m²K

*0.14 = surface resistance + deck

Alternative (cold deck):

  • Insulation below deck (between joists)
  • Requires 50mm ventilation gap above insulation
  • More complex, rarely used for new builds

Method 3: Rafter Insulation (Room-in-Roof)

Challenge: Limited space between rafters (typically 100–150mm).

Hybrid solution:

  1. Between rafters: 100mm PIR boards
  2. Below rafters: 50mm PIR + 12.5mm plasterboard
  3. Breathable membrane: Above rafters (vapor escape)

U-value calculation:

  • 150mm total PIR: R-value = 6.8 m²K/W
  • U-value = 1 ÷ (6.8 + 0.14) = 0.14 W/m²K

Alternative (external insulation):

  • Add 50mm PIR above rafters (sarking board)
  • Reduces ceiling height internally

Insulation Material Comparison

MaterialR-Value (W/mK)Depth for 0.16 U-ValueCost (£/m²)LifespanEco Rating
PIR Boards0.022140mm£3050 yrsModerate
Mineral Wool0.037300mm£1050 yrsGood
Glass Wool0.035280mm£850 yrsGood
Wood Fiber0.040350mm£4050 yrsExcellent
Sheep’s Wool0.038320mm£5050 yrsExcellent
EPS (Polystyrene)0.034270mm£1250 yrsPoor (fire risk)

Best value: Mineral wool (affordable, non-combustible)
Best performance: PIR boards (thinnest for same R-value)
Most sustainable: Wood fiber (carbon-negative, 100% recyclable)

Compliance & Certification

When Part L Applies

Mandatory compliance:New builds – All dwellings (sign-off required)
Extensions >40m² – Building Control inspects
Major renovations – >25% of building envelope
Change of use – E.g., barn conversion to dwelling

Not required:Like-for-like re-roofing – Replacing slates/tiles without structural change
Repairs – Fixing leaks, repointing ridges
Minor extensions – <40m² conservatories (subject to planning)

Inspection & Certification

Step 1: Design (Architect/Engineer)

  • U-value calculations submitted with planning application
  • Building Control reviews compliance

Step 2: Installation (Contractor)

  • Approved insulation materials (CE marking)
  • Correct depth/layers (inspector may measure)

Step 3: Sign-Off (Completion)

  • Certificate of Compliance issued by builder
  • Building Control spot-checks (10–20% of projects)

Step 4: EPC Assessment (New Builds Only)

  • Energy Saving Trust assessor measures insulation depth
  • EPC certificate issued (A1–G rating)

Common Non-Compliance Issues

1. Insufficient Depth (Most Common)

Problem: Contractor installs 200mm instead of 300mm

Consequence:

  • U-value = 0.20 W/m²K (fails 0.16 standard)
  • EPC rating drops 1 grade (A3 → B1)
  • Building Control rejects sign-off

Fix: Add 100mm cross-layer (£500–£1,000)

2. Compressed Insulation

Problem: Storage items in attic compress insulation

Consequence:

  • 300mm compressed to 150mm = 50% R-value loss
  • U-value rises to 0.30 W/m²K

Fix: Remove items, add attic floor boards over raised joists

3. Gaps at Eaves/Soffits

Problem: Insulation doesn’t extend to eaves (thermal bridging)

Consequence:

  • Cold spots → condensation → mold
  • Heat loss at perimeter

Fix: Fill gaps with expanding foam + mineral wool

4. Missing Vapor Control Layer (Flat Roofs)

Problem: No vapor barrier below insulation

Consequence:

  • Moisture condenses inside insulation → reduced R-value
  • Structural timber rot

Fix: Retrofit vapor control layer (requires roof stripping)

Energy Saving Trust Grant Requirements (Voluntary Upgrades)

Attic Insulation Grant (£1,600)

Eligibility:

  • Home built before 2011
  • Current insulation <200mm
  • EPC cert required (pre- and post-work)

Standard:

  • Upgrade to 300mm (0.16 W/m²K)
  • Use Energy Saving Trust-approved materials
  • Registered contractor only

Payback: 3–5 years (energy savings)

Rafter Insulation Grant (£3,200)

Eligibility:

  • Home built before 2011
  • Room-in-roof/converted attic
  • EPC cert required

Standard:

  • Achieve 0.16 W/m²K (hybrid system)
  • Breathable membrane required
  • Fire-rated materials

Payback: 5–8 years

Deep Retrofit Grant (£25,000)

Eligibility:

  • Improve home by 2+ EPC grades (e.g., D2 → B2)
  • Roof insulation + walls + windows + heating

Roof component:

  • Must achieve 0.16 W/m²K minimum
  • Can include green roof, solar PV

Payback: 10–15 years (combined measures)

Energy Saving Trust grant application guide

FAQ: Part L Roof Insulation

Q: Do I need 300mm if re-roofing my home?

A: Not legally (if built pre-2011), but recommended. Energy Saving Trust grants cover £1,600 of cost, payback is 3–5 years. EPC rating improves (helps resale).

Q: Can I use 150mm PIR instead of 300mm mineral wool?

A: Yes – PIR has better R-value per mm. 150mm PIR ≈ 300mm mineral wool. More expensive (£30/m² vs £10/m²) but saves attic headroom.

Q: What if my rafters are only 100mm deep?

A: Use hybrid system: 100mm PIR between rafters + 50mm below rafters + external sarking board. Achieves 0.16 U-value.

Q: Does Part L apply to listed buildings?

A: Protected structures exempt (conservation overrides energy efficiency). Planning office decides on case-by-case basis.

Q: How do I prove compliance for Building Control?

A: Keep:

  • Material delivery receipts (CE marking)
  • U-value calculation (architect/engineer)
  • Installation photos (depth measurement)
  • EPC certificate (new builds)

Energy Savings: Insulation Impact

Heating Cost Reduction

Scenario: 3-bed semi-detached, 100m² roof, gas heating

Insulation LevelU-ValueAnnual Heat LossHeating Cost/YearEPC Rating
None (1960s)2.3 W/m²K5,800 kWh£750E2
100mm (2000s)0.35 W/m²K900 kWh£120C3
300mm (2025)0.16 W/m²K410 kWh£55A3

Savings (None → 300mm): £695/year
Payback (£1,500 cost - £1,600 grant): Immediate (net profit)

Carbon Reduction

300mm insulation upgrade:

  • Heating reduction: 5,400 kWh/year
  • Carbon savings: 1.0 tonnes CO₂/year (gas heating)
  • Lifetime savings (50 years): 50 tonnes CO₂

Equivalent to: Planting 1,250 trees

Conclusion: Meeting 2025 Standards

For new builds/extensions:

  • 300mm attic insulation (mineral wool)
  • 150mm flat roof insulation (PIR)
  • 200mm rafter insulation (hybrid PIR system)

For existing homes (voluntary):

  • Energy Saving Trust grant: £1,600–£3,200
  • Payback: 3–5 years
  • EPC improvement: 2–3 grades

For homeowners:

  • Hire Energy Saving Trust-registered contractors
  • Request U-value calculations
  • Keep compliance records

Need a Part L-compliant roofing contractor? Get quotes from certified professionals


Official Sources

  1. gov.uk Technical Guidance Document Part L – https://www.gov.uk/housing/building-standards/technical-guidance-documents
  2. Energy Saving Trust Better Energy Homes Standards – https://www.energysavingtrust.org.uk/home-energy/home-energy-grants/
  3. Building Control Act 2007 – https://www.legislation.gov.uk/eli/2007/act/21/enacted/en/html
  4. BS EN ISO 6946:2017 (U-Value Calculation) – https://www.nsai.co.uk/

Tags:

insulation standardspart lu-valuebuilding regulations2025

Need Professional Roofing Services?

Our expert team is ready to help with all your roofing needs across UK.

Get Your Free Quote

Related Articles